Over the weekend I was able to get a lot done on the Army Cathedral Window quilt. I got 6 rows finished and attached to the main body of the quilt.
I have to cut about 125 more of the black inset squares. Hopefully later today I can set up the rotary cutting mat and get cutting. Unfortunately, although the sewing machine is all set up in my bedroom, so multiple times a day I can just set and sew for a few minutes or more. But the rotary cutting mat is bigger and I have to set that up either on the living room coffee table or the kitchen table.
I have a small pile of denim cut from old jeans and 1 uncut pair of jeans built up. Hopefully I can get them all cut into the circles for future quilts. The store easier in less place once they are cut.
I have an excited new variation of the Denim Cathedral Window quilt that I am eager to do; but I am trying to finish the Army Cathedral Window quilt first.
No comments:
Post a Comment